Product Range - Benefits

Cost Effective
Fully Diverless
Full strength connection is made regardless of the pile penetration achieved
Requires no specialist personnel, support team or additional equipment to be mobilised offshore
Multiple tool hire included in the fixed cost
Spare C-lok Tools (RRU) provided
Single Lump Sum cost for all services available

Efficient
Single ROV hotstab operation, takes less than 3 minutes for full activation
Minimal vessel deck space required

Versatile
Uses standard workclass ROV hydraulics (3000 psi)
Connector is releasable and reusable as required
Available in full API section range

 

Reliable
Complete Hydraulic System is fully recoverable; no contingency system required
Allows full FAT testing in the shop including optional load tests

Innovative
Wedge plate self-activates to secure the load
Tools (RRU) can be preset on the structure (PCU) prior to loadout
Tools are self-centred and recovered by a simple lift off
Carbon steel construction with dedicated CP anodes
Offers high load resistance in all 6 degrees of freedom